40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
    Reply  Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation DAC_bank.pngASC_schematic.pdf
       Reply  Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification 
          Reply  Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board HV_Amplifier.pdf
             Reply  Thu Jul 11 23:50:57 2013, gautam, Configuration, , PZT Driver Board-changes made ASC_schematic.pdfDAC_Max_output.JPG
                Reply  Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum max_amp.JPGmax_amp_all_channels.JPGDACOffPowerSpec.pdfDACOnPowerSpec.pdfDAC2kPowerSpectrum.pdf
                   Reply  Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum 
                      Reply  Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units DACOffPSD.pdfDAC500PSD.pdfDAC2000PSD.pdf
                         Reply  Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units 
                            Reply  Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth DAC-6.4_kHz_BW_PSD.pdf
                               Reply  Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches D000186_Frequency_Response.pdf
                                  Reply  Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration QPD-XCalib.pdfQPD-YCalib.pdfError_Function_Fitting.zip
                                     Reply  Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts Piezo-mirror.jpg
                                        Reply  Thu Jul 18 23:34:40 2013, gautam, Configuration, endtable upgrade, Coarse adjustment of PZT axes orientation in mount PZT_out_waveform.jpg
                                           Reply  Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT QPD-XCalib.pdfQPD-YCalib.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Pitch_tilt.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Yaw_tilt.pdf
                                              Reply  Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors M1_Pitch_calib.pdfM1_Yaw_calib.pdfM2_Pitch_calib.pdfM2_Yaw_calib.pdfPI_S330.20L.pdf
                                                 Reply  Mon Aug 5 18:48:44 2013, gautam, Configuration, endtable upgrade, Full range calibration of PZT mounted mirrors for Y-endtable 2-inch-CVI-Yawcalib.pdf2-inch-CVI-Pitchcalib.pdf1-inch-Laseroptik-Yawcalib.pdf1-inch-Laseroptik-Pitchcalib.pdf
                                        Reply  Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  Piezo-mirror_2.JPG
                                           Reply  Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  
                                  Reply  Thu Jul 18 21:12:58 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-All channels modified AI_Board_Output.jpg
                Reply  Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes D980323-C-modified.pdfD980323-C-modified-pg2.pdf
          Reply  Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9 
             Reply  Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested 
Message ID: 8942     Entry time: Tue Jul 30 19:40:47 2013     In reply to: 8935
Author: gautam 
Type: Configuration 
Category: endtable upgrade 
Subject: DAC-PZT Driver Board Output Signal Chain Tested 

 

 [Alex, Gautam]

The signal chain from the DAC output to the output of the PZT driver board (including the HV supply) has been verified. 

I had installed the two boards in the eurocrate yesterday and laid out the cables from 1X9 to the endtable. The output of the AI board had been verified using the monitor port on the front panel, but the output from the PZT driver board was yet to be checked because I had not connected the HV supply yesterday.

When I tried this initially today, I was not getting the expected output from the monitor channels on the front panel of the PZT driver board, even though the board was verified to be working. Alex helped debug the problem, which was identified as the -15V supply voltage not making it onto the board.

I changed the slot the board was sitting in, and used a long screw to bolt the board to the crate. Both the AI board and the PZT driver board seem to be slightly odd-sized, and hence, will not work unless firmly pushed into the eurocrate and bolted down. This would be the first thing to check if a problem is detected with this system. 

In any case, I have bolted both boards to the eurocrate, and the output from the PZT driver board is as expected when I sent a 10Vp sine wave out from the DAC. I think the cables can now be hooked up to the PZTs once we are pumped down.

ELOG V3.1.3-