Entry  Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
    Reply  Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation DAC_bank.pngASC_schematic.pdf
       Reply  Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification 
          Reply  Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board HV_Amplifier.pdf
             Reply  Thu Jul 11 23:50:57 2013, gautam, Configuration, , PZT Driver Board-changes made ASC_schematic.pdfDAC_Max_output.JPG
                Reply  Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum max_amp.JPGmax_amp_all_channels.JPGDACOffPowerSpec.pdfDACOnPowerSpec.pdfDAC2kPowerSpectrum.pdf
                   Reply  Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum 
                      Reply  Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units DACOffPSD.pdfDAC500PSD.pdfDAC2000PSD.pdf
                         Reply  Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units 
                            Reply  Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth DAC-6.4_kHz_BW_PSD.pdf
                               Reply  Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches D000186_Frequency_Response.pdf
                                  Reply  Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration QPD-XCalib.pdfQPD-YCalib.pdfError_Function_Fitting.zip
                                     Reply  Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts Piezo-mirror.jpg
                                        Reply  Thu Jul 18 23:34:40 2013, gautam, Configuration, endtable upgrade, Coarse adjustment of PZT axes orientation in mount PZT_out_waveform.jpg
                                           Reply  Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT QPD-XCalib.pdfQPD-YCalib.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Pitch_tilt.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Yaw_tilt.pdf
                                              Reply  Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors M1_Pitch_calib.pdfM1_Yaw_calib.pdfM2_Pitch_calib.pdfM2_Yaw_calib.pdfPI_S330.20L.pdf
                                                 Reply  Mon Aug 5 18:48:44 2013, gautam, Configuration, endtable upgrade, Full range calibration of PZT mounted mirrors for Y-endtable 2-inch-CVI-Yawcalib.pdf2-inch-CVI-Pitchcalib.pdf1-inch-Laseroptik-Yawcalib.pdf1-inch-Laseroptik-Pitchcalib.pdf
                                        Reply  Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  Piezo-mirror_2.JPG
                                           Reply  Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  
                                  Reply  Thu Jul 18 21:12:58 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-All channels modified AI_Board_Output.jpg
                Reply  Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes D980323-C-modified.pdfD980323-C-modified-pg2.pdf
          Reply  Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9 
             Reply  Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested 
Message ID: 8875     Entry time: Thu Jul 18 21:12:58 2013     In reply to: 8857
Author: gautam 
Type: Configuration 
Category: endtable upgrade 
Subject: AI Board-D000186-All channels modified 

 

 I carried some further modifications and tests to the AI Board. Details and observations here:

  • I switched out the resistors for all the remaining 7 channels, using the same substitutions as detailed here
  • I then verified that the modified transfer function for all 8 channels using the SR785. I did not collect data for all the channels as netgpib was taking ages, but I did use the cursor on the screen to verify the position of the first notch at ~64 kHz. I noticed that all the channels did not have the lowest point of the notch at the same frequency. Rather, (at least on the screen), this varied between 63kHz and 67kHz. I would put this down to component tolerance. Assuming 5% tolerance shifts the theoretical notch frequency from 66268 Hz to 63112 Hz. 
  • After verifying the transfer functions, I went to 1Y4 and plugged the AI board into the eurocrate. I then connected the input of the AI board to the DAC output using my custom ribbon cable. Next, I used the excitation points set up earlier to send a 1 kHz, 32000 counts amplitude sine wave through the channels one at a time. I monitored the output using an oscilloscope and the LEMO monitor channels on the front panel of the board.
  • I found that the single-ended output of the AI board swings between -10 V and 10 V (w.r.t ground, oscilloscope trace attached). This is good because this is the range of input voltage to the PZT driver boards required to realize the full actuation range of the PZTs.
  • I also verified that the connections on the custom ribbon cable are correct (channel map was right) and that there were no accidental shorts (I checked other channels' output monitor while driving one channel). 

I think the board is okay to be used now.

AI_Board_Output.jpg

 