Entry  Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
    Reply  Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation DAC_bank.pngASC_schematic.pdf
       Reply  Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification 
          Reply  Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board HV_Amplifier.pdf
             Reply  Thu Jul 11 23:50:57 2013, gautam, Configuration, , PZT Driver Board-changes made ASC_schematic.pdfDAC_Max_output.JPG
                Reply  Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum max_amp.JPGmax_amp_all_channels.JPGDACOffPowerSpec.pdfDACOnPowerSpec.pdfDAC2kPowerSpectrum.pdf
                   Reply  Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum 
                      Reply  Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units DACOffPSD.pdfDAC500PSD.pdfDAC2000PSD.pdf
                         Reply  Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units 
                            Reply  Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth DAC-6.4_kHz_BW_PSD.pdf
                               Reply  Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches D000186_Frequency_Response.pdf
                                  Reply  Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration QPD-XCalib.pdfQPD-YCalib.pdfError_Function_Fitting.zip
                                     Reply  Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts Piezo-mirror.jpg
                                        Reply  Thu Jul 18 23:34:40 2013, gautam, Configuration, endtable upgrade, Coarse adjustment of PZT axes orientation in mount PZT_out_waveform.jpg
                                           Reply  Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT QPD-XCalib.pdfQPD-YCalib.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Pitch_tilt.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Yaw_tilt.pdf
                                              Reply  Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors M1_Pitch_calib.pdfM1_Yaw_calib.pdfM2_Pitch_calib.pdfM2_Yaw_calib.pdfPI_S330.20L.pdf
                                                 Reply  Mon Aug 5 18:48:44 2013, gautam, Configuration, endtable upgrade, Full range calibration of PZT mounted mirrors for Y-endtable 2-inch-CVI-Yawcalib.pdf2-inch-CVI-Pitchcalib.pdf1-inch-Laseroptik-Yawcalib.pdf1-inch-Laseroptik-Pitchcalib.pdf
                                        Reply  Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  Piezo-mirror_2.JPG
                                           Reply  Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  
                                  Reply  Thu Jul 18 21:12:58 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-All channels modified AI_Board_Output.jpg
                Reply  Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes D980323-C-modified.pdfD980323-C-modified-pg2.pdf
          Reply  Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9 
             Reply  Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested 
Message ID: 8804     Entry time: Mon Jul 8 13:45:19 2013     In reply to: 8800     Reply to this: 8823   8935
Author: gautam 
Type: Configuration 
Category: endtable upgrade 
Subject: Driver board verification 

With the help of an expansion card,  I verified that the + 15V and + 24V from the eurocrate in the slot I've identified for the PZT driver boards are making their way to the board. The slot is at the right-most end of the eurocrate in 1Y4, and the rack door was getting in the way of directly measuring these voltages once I hooked up the driver board to the expansion card. So I just made sure that all the LEDs on the expansion card lit up (indicating that the eurocrate is supplying + 5, + 15 and + 24V), and then used a multimeter to check continuity between the expansion card and the driver board outside of the eurocrate. The circuit only uses + 15V and + 24V, and I checked for continuity at all the IC pins marked with these voltages on the schematic.

Since the whole point of this test was to see if the slot I identified was delivering the right voltages, I think this is sufficient. I will now need to fashion a cable that I can use to connect a DC power supply to the PZT driver boards so that these can be tested further.

The high voltage points (100V DC) remain to be tested.