Entry  Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
    Reply  Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation DAC_bank.pngASC_schematic.pdf
       Reply  Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification 
          Reply  Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board HV_Amplifier.pdf
             Reply  Thu Jul 11 23:50:57 2013, gautam, Configuration, , PZT Driver Board-changes made ASC_schematic.pdfDAC_Max_output.JPG
                Reply  Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum max_amp.JPGmax_amp_all_channels.JPGDACOffPowerSpec.pdfDACOnPowerSpec.pdfDAC2kPowerSpectrum.pdf
                   Reply  Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum 
                      Reply  Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units DACOffPSD.pdfDAC500PSD.pdfDAC2000PSD.pdf
                         Reply  Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units 
                            Reply  Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth DAC-6.4_kHz_BW_PSD.pdf
                               Reply  Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches D000186_Frequency_Response.pdf
                                  Reply  Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration QPD-XCalib.pdfQPD-YCalib.pdfError_Function_Fitting.zip
                                     Reply  Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts Piezo-mirror.jpg
                                        Reply  Thu Jul 18 23:34:40 2013, gautam, Configuration, endtable upgrade, Coarse adjustment of PZT axes orientation in mount PZT_out_waveform.jpg
                                           Reply  Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT QPD-XCalib.pdfQPD-YCalib.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Pitch_tilt.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Yaw_tilt.pdf
                                              Reply  Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors M1_Pitch_calib.pdfM1_Yaw_calib.pdfM2_Pitch_calib.pdfM2_Yaw_calib.pdfPI_S330.20L.pdf
                                                 Reply  Mon Aug 5 18:48:44 2013, gautam, Configuration, endtable upgrade, Full range calibration of PZT mounted mirrors for Y-endtable 2-inch-CVI-Yawcalib.pdf2-inch-CVI-Pitchcalib.pdf1-inch-Laseroptik-Yawcalib.pdf1-inch-Laseroptik-Pitchcalib.pdf
                                        Reply  Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  Piezo-mirror_2.JPG
                                           Reply  Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  
                                  Reply  Thu Jul 18 21:12:58 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-All channels modified AI_Board_Output.jpg
                Reply  Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes D980323-C-modified.pdfD980323-C-modified-pg2.pdf
          Reply  Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9 
             Reply  Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested 
Message ID: 8746     Entry time: Tue Jun 25 19:18:07 2013     Reply to this: 8800
Author: gautam 
Type: Configuration 
Category: endtable upgrade 
Subject: plan of action for PZT installation 

  This entry is meant to be a sort of inventory check and a tentative plan-of-action for the installation of the PZT mounted mirrors and associated electronics on the Y-endtable. 

Hardware details:

  •  PZT mounts are cleaned and ready to be put on the end-tables.
  • The PZTs being used are PI S-330.20L Piezo Tip/Tilt Platforms. Each endtable requires two of these. The input channels have male single-lemo connectors. There are 3 channels on each tip/tilt platform, for tilt, yaw and a bias voltage.
  • The driver boards being used are D980323 Rev C. Each board is capable of driving 2 piezo tip/tilt platforms. I am not too sure of this but I think that the SMA female connector on these boards is meant to be connected with the bias voltage from our Kepco high-voltage power supplies. The outputs on these boards are fitted with SMB female connectors, while the piezo tip/tilt platforms have male single-lemo connectors. We will have to source cables with the appropriate connectors to run between the end-table and rack 1Y4 (see below). The input to these boards from the DAC will have to be made with a custom ribbon connector as per the pin out configuration given in the circuit drawing.
  • High-voltage power supply: KEPCO BHK 300-130 MG. This will supply the required 100V DC bias voltage to the piezo tip/tilts via the driver board. Since each board is capable of driving two piezos, we will only need one unit per end-table. The question is where to put these (photo attached). It doesn't look like it can be accommodated in 1Y4 (again photo attached) and the power cable the unit came with is only about 8ft long. If we put these under the end-tables, then we will need an additional long (~10m) cable to run from these to the driver boards at 1Y4 carrying 100 V. 
  •  We will need long (~10m by my rough measurement at the X and Y ends) cables to run from rack 1Y4 to the endtable to drive the piezos. These will have to be high-voltage tolerant (at least to 100V DC) and should have SMB male connectors at one end and female single-lemo connectors at the other. I have emailed 3 firms (CD International Technologies Inc., Stonewall Cables, and Fairview Microwave) detailing our requirements and asking for a quote and estimated time for delivery. We will need 6 of these, plus another cable with an SMA connector on one end and the other end open to connect the 100V DC bias voltage from the high voltage power supply to the driver boards (the power supply comes with a custom jack to which we can solder open leads). We will also possibly need ~3m long lemo-to-?(I need to check what the input connector for the data acquisition channels) cables for the monitoring channels, I am not sure if these are available, I will check with Steve tomorrow.

Other details:

  • I have attached a wiring diagram with the interconnects between various devices at various places and the type of connectors required etc. The error signal will the the transmitted green light from the cavity, and there is already a DQ channel logging this information, so nothing additional wiring is required to this end.
  • Jamie had detailed channel availability in elog 8580. I had a look at rack 1Y4, and there were free DAC channels available, but I am not sure as to which of the ones listed in the elog it corresponds to. In any case, Jamie did mention that there are sufficient channels available at the end-stations for this purposes, but all of these are fast channels. What needs to be decided is if we are going ahead and using the fast channels, or if we need to find slow DAC channels. 
  • I spoke to Koji about gluing the mirrors to the PZTs, and he says we can use superglue, and also to be sure to clean both the mirror and the tip/tilt surfaces before gluing. In any case, all the other hardware issues need to be sorted out first before thinking about gluing the mirrors.

High-Voltage Power Supply

photo_3.JPG

 

Situation at rack 1Y4

 

photo_4.JPG

 Wiring diagram

ASC_schematic.pdf