40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 8689     Entry time: Fri Jun 7 21:33:39 2013
Author: Manasa 
Type: Update 
Category: PSL 
Subject: PSL green to Y- BEAT PD blocked 

To allow Annalisa to work on the Y-green alignment as I work with the X-green, the part of the PSL green beam that goes to the Y-green beat PD has been blocked with an iris.

ELOG V3.1.3-