[Annalisa, Koji]
GREEN
I aligned back the beam (we lost part of the alignment after we put back the box and after the posts were installed). The green beam out from the crystal is still low, but anyway I get about 1.2 mW of green out from the Faraday.
TO DO
Mode Matching calculation (tomorrow)
Fix the dumping situation
Replace some of the mounts with more solid ones (in the future)
TRANSMON PATH
QPD, PD and Camera have been rotated as Rana suggested last Wednesday. A 1m focal length lens is on the main beam transmitted path (before the harmonic separator), and the beam diameter on the QPD is about 5mm. We put another lens with a shorter focal length to put the PD very close to the beam waist and in way to have a reasonable beam size on the camera. Tomorrow I will write down all the correct sizes of the beams.
OPLEV
(for Steve) I marked a possible beam path for the Oplev (the laser is not in the right place in the picture, but I left it in the correct place on the table). I also put the QPD for the IP-ANG, so we know in which part of the table the beam can be steered.
The space in the red rectangle (right corner) has to be left empty to put a PD for the rejected beam from the green Faraday.
|