Tue Nov 13 11:30:54 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser
|
Tue Nov 13 16:18:51 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile
|
Tue Nov 13 20:13:07 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile
|
Mon Nov 19 20:03:53 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table
|
Mon Nov 19 20:17:53 2012, Jenne, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table
|
Mon Nov 19 22:42:14 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table
|
Tue Nov 20 11:40:19 2012, rana, Configuration, Green Locking, End table upgrade for auxiliary green laser : ETMX layout on new table
|
Wed Dec 12 11:04:45 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table
|
Thu Jan 10 12:41:06 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : wiki page
|
Tue Mar 5 00:24:52 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : customized mount
|
Tue Mar 19 14:21:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade : INVENTORY
|
Tue Mar 19 19:19:50 2013, Jenne, Update, 40m Upgrading, Endtable upgrade : INVENTORY
|
Wed Mar 20 14:00:21 2013, Steve, Update, 40m Upgrading, Endtable upgrade
|
Wed Mar 20 15:51:54 2013, Manasa, Update, 40m Upgrading, Endtable upgrade
|
Thu Mar 21 08:11:53 2013, Steve, Update, 40m Upgrading, ETMY table swap
|
Thu Mar 21 08:46:46 2013, Manasa, Update, 40m Upgrading, ETMY table swap
|
Thu Mar 21 17:06:34 2013, Steve, Update, 40m Upgrading, ETMY table is out
|
Mon Mar 25 18:07:31 2013, Steve, Update, 40m Upgrading, ETMY table is out
|
Tue Mar 26 16:10:31 2013, Jamie, Update, 40m Upgrading, ETMY table leveling
|
Tue Mar 26 16:36:24 2013, Steve, Update, 40m Upgrading, table leveling mounts go here 
|
Fri Mar 29 16:30:27 2013, Steve, Update, 40m Upgrading, table leveling mounts go here
|
Fri Mar 29 16:35:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade
|
Tue Apr 2 17:23:23 2013, Steve, Update, 40m Upgrading, new ETMY optical table & enclosure in place
|
Thu Apr 4 17:23:05 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics
|
Fri Apr 5 01:18:34 2013, Manasa, Update, 40m Upgrading, Not a fan of the new plastic box yet
|
Sat Apr 6 09:21:36 2013, rana, Update, 40m Upgrading, Not a fan of the new plastic box yet
|
Mon Apr 8 16:37:26 2013, Steve, Update, 40m Upgrading, ETMY enclosure wall transmission
|
Mon Apr 22 17:43:09 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics
|
Mon Apr 22 19:48:56 2013, Jenne, Update, 40m Upgrading, 4 pins enough?
|
Tue Apr 23 15:00:20 2013, Jenne, Update, 40m Upgrading, 4 pins enough?
|
Mon Mar 25 18:42:38 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Timeline
|
Fri Mar 29 00:27:06 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Assembly 
|
Fri Apr 5 01:28:56 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table
|
Tue Apr 9 00:15:18 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table
|
Wed Apr 10 14:25:04 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : LWE Alberto laser beam profile 
|
Wed Apr 17 02:20:13 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
|
Wed Apr 24 15:27:59 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress: New layout
|
Tue May 7 19:06:45 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Thu May 9 01:36:32 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Thu May 9 22:29:23 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Fri May 10 20:05:21 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Mon May 13 21:35:55 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Tue May 14 14:24:56 2013, Steve, Update, 40m Upgrading, enclosure removal
|
Thu May 16 08:32:05 2013, Steve, Update, 40m upgrading, ETMY op table disabled
|
Fri May 17 00:32:32 2013, Annalisa, Update, 40m upgrading, ETMY - progress
|
Fri May 17 15:38:51 2013, Steve, Update, 40m upgrading, ETMY enclosure is on the way back
|
Fri May 17 16:06:14 2013, rana, Update, 40m upgrading, ETMY op table disabled
|
Fri May 17 18:24:04 2013, Annalisa, Update, 40m upgrading, ETMY - progress
|
Thu May 23 00:16:32 2013, Annalisa, Update, 40m upgrading, ETMY - progress
|
Thu May 23 12:02:48 2013, Steve, Update, endtable upgrade, ETMY - oplev
|
Thu May 30 11:10:00 2013, Steve, Update, endtable upgrade, ETMY - oplev
|
Thu May 30 20:45:53 2013, Annalisa, Update, endtable upgrade, ETMY - oplev
|
Fri May 31 11:15:01 2013, Annalisa, Update, endtable upgrade, ETMY - Mode Matching for green - new calculation
|
Fri Sep 11 10:56:47 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough
|
Tue Sep 15 16:49:08 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough
|
Thu Sep 17 02:22:53 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough
|
Fri May 24 02:12:50 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green  
|
Fri May 24 11:38:00 2013, Koji, Update, 40m upgrading, ETMY - Mode Matching for green
|
Fri May 24 12:50:25 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green
|
Sat May 25 02:03:48 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green - new calculation    
|
Mon May 27 21:38:53 2013, Annalisa, Update, 40m upgrading, ETMY - Beam Dumps
|
Tue May 28 22:11:23 2013, Annalisa, Update, 40m upgrading, ETMY - Yarm shutter cable
|
Tue May 21 17:03:45 2013, Steve, Update, endtable upgrade, enclosure tops are sealed   
|
Thu Jun 6 09:58:13 2013, Steve, Update, endtable upgrade, enclosure to chamber connection 
|
Tue Dec 22 16:39:42 2015, Steve, Update, endtable upgrade, ETMY optical table enclosure  
|
Tue May 14 21:03:15 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Wed May 15 21:27:39 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Thu May 2 01:19:41 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Tue Apr 9 00:32:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place
|
Tue Apr 9 08:37:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place
|
Tue Apr 9 21:27:48 2013, Jenne, Update, 40m Upgrading, TRY temporarily in place
|
|
Message ID: 8606
Entry time: Tue May 21 17:03:45 2013
In reply to: 8571
Reply to this: 8685
|
Author: |
Steve |
Type: |
Update |
Category: |
endtable upgrade |
Subject: |
enclosure tops are sealed |
|
|
Quote: |
I'm planning to remove the ETMY optical table enclosure and move it over to CES Shop 8am Thursday morning.
We'll install spring loaded lathes, hooks and quick release pins.
The bridge will be reinforced with steel plate to support release pins on posts.
There will be an other cut out for cable feedtrough as it is shown on elog #8472
Let me know if this timing does not fit your work.
|
The bridge support posts were shimmed today. Surgical tubing 402R - o - rings were glued togeather with " instant krazy glue "
Atm2 Carey CH-3540 latches are compressed ~2.5 mm in the clamped position.
Atm3 is showing the captured quick release pin in the steel reinforced bridge that is supported by the post. It works great. The post screw is sealed by o-ring. The quick-pin is sealed by an epoxy attached copper cap.
Atm4 Enclosure is on it's back. Bottom o-ring can be seen. The hole reinforced bridge structure is visible.
Now I'm working on the window connection to the chamber. I'm very close leak checking this box.
In case of leaking around the top tubing seals we have two options:
a, cut down on the cover rim by 0.040" or b, increase tubing diameter |
|
|
|
|
|
|
|