I have found in the depths of the elog the (original?) list of fibers and lengths that were decided upon: elog 6535.
In Suresh's elog, we were assuming that POP22 & POP110 would be served by a single PD. This is still the nominal plan, although we (Rana is maybe still thinking about this in the back of his head?) think that it might not be feasible. Riju and I were hoping to put a 4th fiber in the tubing so that we wouldn't have to add it later if POP22 & POP110 are eventually 2 separate PDs. Anyhow, for now, all we have available are 3 fibers for the POX table, so that is what was installed this afternoon. |