40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 8467     Entry time: Fri Apr 19 16:58:59 2013
Author: Jenne 
Type: Update 
Category: ASC 
Subject: Arm A2L measurement scripts 90% working again 

After Den's work with the ASS model this week, all of the channel names were changed (this wasn't pointed out in his elog....grrr), so none of the A2L scripts worked. 

They are now back, however there is still some problem with the plotting that I'm not sure I understand yet.  So, the measurement works, but I don't think we're saving the results and we certainly aren't plotting them yet. 

I wanted to check where the spots are on the mirrors, to make sure Den's stuff is doing what we think it's doing.  All of the numbers were within ~1.5mm of center, although Rossa keeps crashing (twice this afternoon?!?), so I can't copy and paste the numbers into the elog.

A near-term goal is to copy over Den's work on the Yarm to the Xarm, so that both arms will auto-align.  Also, I need to put the set of alignment scripts in a wrapper, and have that wrapper call-able from the IFO Configure screen.

Also, while thinking about the IFO Configure screen, the "save" scripts weren't working (on Rossa) today, even though I just made them work a week or so ago. Rossa, at least, was unhappy running csh, so I changed the "save" script over to bash.

ELOG V3.1.3-