Entry  Mon Apr 15 16:10:52 2013, Den, Update, PEM, seismometer isolation kit  
    Reply  Thu Apr 18 15:08:14 2013, Steve, Update, PEM, seismometer isolation kit in place grouting1.jpggrouting2.jpggrouting3.jpggrouting4.png
       Reply  Tue Apr 23 16:17:45 2013, Den, Update, PEM, seismometer isolation kit in place Base.pdf.pdfConnectorPlate.pdf
Message ID: 8461     Entry time: Thu Apr 18 15:08:14 2013     In reply to: 8456     Reply to this: 8477
Author: Steve 
Type: Update 
Category: PEM 
Subject: seismometer isolation kit in place 

Quote:

 We got granite bases today from the manufacturer. We plan to set them up on Wednesday, 8 am. Please note, there will be an installation mess at Xend, Yend and corner during ~4 hours. Let us know if you have any objections to do this at this particular time.

Installation locations are specified in elog 8270, scheme attached is valid except for Xend. Instrument will be installed on the place of nitrogen containers.

(  next to the wall at corner sout-east of the south end )

 The carpenter shop finished the installation of the 3 granite bases.Rapid Set Cement All high strength non-shrink grout was used.

 Compressive strength  3000 PSI at 1 hour and 9000 PSI at day 28 The janitor is still cleaning up after them at the south end.

The  soft silicon gas kits are working well with the SS can.  Den is making  the adaptor plate drawing for the feedthrough.

Attachment 1: grouting1.jpg  220 kB  | Hide | Hide all
grouting1.jpg
Attachment 2: grouting2.jpg  182 kB  | Hide | Hide all
grouting2.jpg
Attachment 3: grouting3.jpg  158 kB  | Hide | Hide all
grouting3.jpg
Attachment 4: grouting4.png  33 kB  Uploaded Thu Apr 18 16:51:26 2013  | Hide | Hide all
grouting4.png
ELOG V3.1.3-