Tue Nov 13 11:30:54 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser
|
Tue Nov 13 16:18:51 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile
|
Tue Nov 13 20:13:07 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile
|
Mon Nov 19 20:03:53 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table
|
Mon Nov 19 20:17:53 2012, Jenne, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table
|
Mon Nov 19 22:42:14 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table
|
Tue Nov 20 11:40:19 2012, rana, Configuration, Green Locking, End table upgrade for auxiliary green laser : ETMX layout on new table
|
Wed Dec 12 11:04:45 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table
|
Thu Jan 10 12:41:06 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : wiki page
|
Tue Mar 5 00:24:52 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : customized mount
|
Tue Mar 19 14:21:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade : INVENTORY
|
Tue Mar 19 19:19:50 2013, Jenne, Update, 40m Upgrading, Endtable upgrade : INVENTORY
|
Wed Mar 20 14:00:21 2013, Steve, Update, 40m Upgrading, Endtable upgrade
|
Wed Mar 20 15:51:54 2013, Manasa, Update, 40m Upgrading, Endtable upgrade
|
Thu Mar 21 08:11:53 2013, Steve, Update, 40m Upgrading, ETMY table swap
|
Thu Mar 21 08:46:46 2013, Manasa, Update, 40m Upgrading, ETMY table swap
|
Thu Mar 21 17:06:34 2013, Steve, Update, 40m Upgrading, ETMY table is out
|
Mon Mar 25 18:07:31 2013, Steve, Update, 40m Upgrading, ETMY table is out
|
Tue Mar 26 16:10:31 2013, Jamie, Update, 40m Upgrading, ETMY table leveling
|
Tue Mar 26 16:36:24 2013, Steve, Update, 40m Upgrading, table leveling mounts go here 
|
Fri Mar 29 16:30:27 2013, Steve, Update, 40m Upgrading, table leveling mounts go here
|
Fri Mar 29 16:35:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade
|
Tue Apr 2 17:23:23 2013, Steve, Update, 40m Upgrading, new ETMY optical table & enclosure in place
|
Thu Apr 4 17:23:05 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics
|
Fri Apr 5 01:18:34 2013, Manasa, Update, 40m Upgrading, Not a fan of the new plastic box yet
|
Sat Apr 6 09:21:36 2013, rana, Update, 40m Upgrading, Not a fan of the new plastic box yet
|
Mon Apr 8 16:37:26 2013, Steve, Update, 40m Upgrading, ETMY enclosure wall transmission
|
Mon Apr 22 17:43:09 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics
|
Mon Apr 22 19:48:56 2013, Jenne, Update, 40m Upgrading, 4 pins enough?
|
Tue Apr 23 15:00:20 2013, Jenne, Update, 40m Upgrading, 4 pins enough?
|
Mon Mar 25 18:42:38 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Timeline
|
Fri Mar 29 00:27:06 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Assembly 
|
Fri Apr 5 01:28:56 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table
|
Tue Apr 9 00:15:18 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table
|
Wed Apr 10 14:25:04 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : LWE Alberto laser beam profile 
|
Wed Apr 17 02:20:13 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
|
Wed Apr 24 15:27:59 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress: New layout
|
Tue May 7 19:06:45 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Thu May 9 01:36:32 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Thu May 9 22:29:23 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Fri May 10 20:05:21 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Mon May 13 21:35:55 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Tue May 14 14:24:56 2013, Steve, Update, 40m Upgrading, enclosure removal
|
Thu May 16 08:32:05 2013, Steve, Update, 40m upgrading, ETMY op table disabled
|
Fri May 17 00:32:32 2013, Annalisa, Update, 40m upgrading, ETMY - progress
|
Fri May 17 15:38:51 2013, Steve, Update, 40m upgrading, ETMY enclosure is on the way back
|
Fri May 17 16:06:14 2013, rana, Update, 40m upgrading, ETMY op table disabled
|
Fri May 17 18:24:04 2013, Annalisa, Update, 40m upgrading, ETMY - progress
|
Thu May 23 00:16:32 2013, Annalisa, Update, 40m upgrading, ETMY - progress
|
Thu May 23 12:02:48 2013, Steve, Update, endtable upgrade, ETMY - oplev
|
Thu May 30 11:10:00 2013, Steve, Update, endtable upgrade, ETMY - oplev
|
Thu May 30 20:45:53 2013, Annalisa, Update, endtable upgrade, ETMY - oplev
|
Fri May 31 11:15:01 2013, Annalisa, Update, endtable upgrade, ETMY - Mode Matching for green - new calculation
|
Fri Sep 11 10:56:47 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough
|
Tue Sep 15 16:49:08 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough
|
Thu Sep 17 02:22:53 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough
|
Fri May 24 02:12:50 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green  
|
Fri May 24 11:38:00 2013, Koji, Update, 40m upgrading, ETMY - Mode Matching for green
|
Fri May 24 12:50:25 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green
|
Sat May 25 02:03:48 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green - new calculation    
|
Mon May 27 21:38:53 2013, Annalisa, Update, 40m upgrading, ETMY - Beam Dumps
|
Tue May 28 22:11:23 2013, Annalisa, Update, 40m upgrading, ETMY - Yarm shutter cable
|
Tue May 21 17:03:45 2013, Steve, Update, endtable upgrade, enclosure tops are sealed   
|
Thu Jun 6 09:58:13 2013, Steve, Update, endtable upgrade, enclosure to chamber connection 
|
Tue Dec 22 16:39:42 2015, Steve, Update, endtable upgrade, ETMY optical table enclosure  
|
Tue May 14 21:03:15 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Wed May 15 21:27:39 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Thu May 2 01:19:41 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress
|
Tue Apr 9 00:32:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place
|
Tue Apr 9 08:37:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place
|
Tue Apr 9 21:27:48 2013, Jenne, Update, 40m Upgrading, TRY temporarily in place
|
|
Message ID: 8417
Entry time: Fri Apr 5 01:18:34 2013
In reply to: 8416
Reply to this: 8419
|
Author: |
Manasa |
Type: |
Update |
Category: |
40m Upgrading |
Subject: |
Not a fan of the new plastic box yet |
|
|
Quote: |
Quote: |
Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm
I have to shim out the enclosure, finish leveling the table and cut surgical tubing O-ring for the top.
|
Glued surgical latex tubing with super glue into O-ring shape. The existing in place tubing K-100, OD 0.125" (actual size 0.140"), wall 0.031", ID 0.062".
I have just found out that tolerances on tubing OD are + - 0.026" by the manufacturer. I'm getting larger tubing for better fit.
The table is ready for optics.
Things left to do:
1, finalize o-ring size 2, finish cable feedthrough 3, finalize window connection 4, IR-Thermashield strips for bridge sides
|
While I did think that the plastic boxes were cool; I am not happy with the new enclosure on several aspects as I am setting up the TRY PDs/camera.
1. I strongly feel the o-rings should be glued/fixed to the plastic box atleast at some points. Even if we replace the current thin one with a thicker tubing, it takes forever to get the o-ring into the groove when it slips out. Also if it slips from the groove, it falls through the optical path and there are chances of burning the tubing when the NPRO is ON.
2. With the transparent tables, the cameras are sensitive to the room lights. I had to switch off the room lights/use ND filters to see a nice beam at the TRY camera.
3. The lids are heavy...might be a good way to train....but removing and putting them back will definitely increase the pain in getting the green aligned to the arms atleast until we have the PZTs set up. |