40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Nov 13 11:30:54 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser ETMX_sch.png
    Reply  Tue Nov 13 16:18:51 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
       Reply  Tue Nov 13 20:13:07 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
       Reply  Mon Nov 19 20:03:53 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.pdf
          Reply  Mon Nov 19 20:17:53 2012, Jenne, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
          Reply  Mon Nov 19 22:42:14 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
             Reply  Tue Nov 20 11:40:19 2012, rana, Configuration, Green Locking, End table upgrade for auxiliary green laser : ETMX layout on new table 
          Reply  Wed Dec 12 11:04:45 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.png
             Reply  Thu Jan 10 12:41:06 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : wiki page 
                Reply  Tue Mar 5 00:24:52 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : customized mount 
                   Reply  Tue Mar 19 14:21:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade : INVENTORY Endtable_inventory.pdf
                      Reply  Tue Mar 19 19:19:50 2013, Jenne, Update, 40m Upgrading, Endtable upgrade : INVENTORY 
                         Reply  Wed Mar 20 14:00:21 2013, Steve, Update, 40m Upgrading, Endtable upgrade  
                            Reply  Wed Mar 20 15:51:54 2013, Manasa, Update, 40m Upgrading, Endtable upgrade  Endtable_inventory.pdf
                               Reply  Thu Mar 21 08:11:53 2013, Steve, Update, 40m Upgrading, ETMY table swap 
                                  Reply  Thu Mar 21 08:46:46 2013, Manasa, Update, 40m Upgrading, ETMY table swap 
                                     Reply  Thu Mar 21 17:06:34 2013, Steve, Update, 40m Upgrading, ETMY table is out ETMYtableSupport.jpg
                                        Reply  Mon Mar 25 18:07:31 2013, Steve, Update, 40m Upgrading, ETMY table is out shimmingEE.jpg
                                           Reply  Tue Mar 26 16:10:31 2013, Jamie, Update, 40m Upgrading, ETMY table leveling end-tabel-leveling.png
                                              Reply  Tue Mar 26 16:36:24 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  optabSTAND.PDFswivvelMountEE.jpg
                                                 Reply  Fri Mar 29 16:30:27 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  
                                                    Reply  Fri Mar 29 16:35:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade 
                                                       Reply  Tue Apr 2 17:23:23 2013, Steve, Update, 40m Upgrading, new ETMY optical table & enclosure in place EEopt1d.jpg
                                                          Reply  Thu Apr 4 17:23:05 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics 
                                                             Reply  Fri Apr 5 01:18:34 2013, Manasa, Update, 40m Upgrading, Not a fan of the new plastic box yet 
                                                                Reply  Sat Apr 6 09:21:36 2013, rana, Update, 40m Upgrading, Not a fan of the new plastic box yet 
                                                                   Reply  Mon Apr 8 16:37:26 2013, Steve, Update, 40m Upgrading, ETMY enclosure wall transmission 
                                                             Reply  Mon Apr 22 17:43:09 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics more2.jpg
                                                                Reply  Mon Apr 22 19:48:56 2013, Jenne, Update, 40m Upgrading, 4 pins enough? 
                                                                   Reply  Tue Apr 23 15:00:20 2013, Jenne, Update, 40m Upgrading, 4 pins enough? 
                Reply  Mon Mar 25 18:42:38 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Timeline Endtable_progress.pdf
                   Reply  Fri Mar 29 00:27:06 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Assembly IMG_0433.JPGIMG_0434.JPG
                      Reply  Fri Apr 5 01:28:56 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table 
                         Reply  Tue Apr 9 00:15:18 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table 
                            Reply  Wed Apr 10 14:25:04 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : LWE Alberto laser beam profile LWE_Alberto_BP.pngbeam_waist.zip
                            Reply  Wed Apr 17 02:20:13 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress TRY_OPL.jpgGRY.jpg
                               Reply  Wed Apr 24 15:27:59 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress: New layout ETMY_endtable_New.png
                                  Reply  Tue May 7 19:06:45 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress ETMY_endtable_New.png
                                     Reply  Thu May 9 01:36:32 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 0509.png
                                        Reply  Thu May 9 22:29:23 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                                           Reply  Fri May 10 20:05:21 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                                              Reply  Mon May 13 21:35:55 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                                                 Reply  Tue May 14 14:24:56 2013, Steve, Update, 40m Upgrading, enclosure removal  
                                                    Reply  Thu May 16 08:32:05 2013, Steve, Update, 40m upgrading, ETMY op table disabled linguaa.jpg
                                                       Reply  Fri May 17 00:32:32 2013, Annalisa, Update, 40m upgrading, ETMY - progress IMG_0536.JPG
                                                          Reply  Fri May 17 15:38:51 2013, Steve, Update, 40m upgrading, ETMY enclosure is on the way back 
                                                          Reply  Fri May 17 16:06:14 2013, rana, Update, 40m upgrading, ETMY op table disabled 
                                                             Reply  Fri May 17 18:24:04 2013, Annalisa, Update, 40m upgrading, ETMY - progress 
                                                                Reply  Thu May 23 00:16:32 2013, Annalisa, Update, 40m upgrading, ETMY - progress TransMonAndOplev.jpg
                                                                   Reply  Thu May 23 12:02:48 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYopl.jpg
                                                                      Reply  Thu May 30 11:10:00 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYoplev.jpg
                                                                         Reply  Thu May 30 20:45:53 2013, Annalisa, Update, endtable upgrade, ETMY - oplev 
                                                                            Reply  Fri May 31 11:15:01 2013, Annalisa, Update, endtable upgrade, ETMY - Mode Matching for green - new calculation 
                                                                         Reply  Fri Sep 11 10:56:47 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMY-Nfeedt.jpg
                                                                            Reply  Tue Sep 15 16:49:08 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMYsFeedt.jpg
                                                                               Reply  Thu Sep 17 02:22:53 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough 
                                                                   Reply  Fri May 24 02:12:50 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green ModeMatchingGreen.jpgModeMatchingGreenZoom.jpgXYpath.jpg
                                                                      Reply  Fri May 24 11:38:00 2013, Koji, Update, 40m upgrading, ETMY - Mode Matching for green 
                                                                         Reply  Fri May 24 12:50:25 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green 
                                                                            Reply  Sat May 25 02:03:48 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green - new calculation ModeMatchingGreenNEW.jpgModeMatchingGreenZoomNEW.jpgXYpathNEW.jpgphoto1.JPGphoto2.JPG
                                                                               Reply  Mon May 27 21:38:53 2013, Annalisa, Update, 40m upgrading, ETMY - Beam Dumps 
                                                                                  Reply  Tue May 28 22:11:23 2013, Annalisa, Update, 40m upgrading, ETMY - Yarm shutter cable 
                                                    Reply  Tue May 21 17:03:45 2013, Steve, Update, endtable upgrade, enclosure tops are sealed  ETMYoptable.jpgsurgtubclamps.jpgquickrelease.jpgreinforcbridge.jpg
                                                       Reply  Thu Jun 6 09:58:13 2013, Steve, Update, endtable upgrade, enclosure to chamber connection thinwallconnector.jpg06061301.PDF
                                                          Reply  Tue Dec 22 16:39:42 2015, Steve, Update, endtable upgrade, ETMY optical table enclosure IMG_0028.JPGIMG_0027.JPGETMY-ISCT_EISOL.jpg
                                                 Reply  Tue May 14 21:03:15 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                                                    Reply  Wed May 15 21:27:39 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                               Reply  Thu May 2 01:19:41 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress ETMY_0502.png
                         Reply  Tue Apr 9 00:32:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place 
                            Reply  Tue Apr 9 08:37:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place 
                            Reply  Tue Apr 9 21:27:48 2013, Jenne, Update, 40m Upgrading, TRY temporarily in place 
Message ID: 8416     Entry time: Thu Apr 4 17:23:05 2013     In reply to: 8392     Reply to this: 8417   8472
Author: Steve 
Type: Update 
Category: 40m Upgrading 
Subject: ETMY optical table & enclosure is ready for optics 

Quote:

 Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm

I have to shim out the enclosure, finish leveling the table and cut surgical tubing O-ring for the top.

 

 Glued surgical latex tubing with super glue into O-ring shape. The existing in place tubing K-100, OD 0.125" (actual size 0.140"), wall 0.031", ID 0.062".

I have just found out that tolerances on tubing OD are + - 0.026" by the manufacturer. I'm getting larger tubing for better fit.

The table is ready for optics.

Things left to do:

1, finalize o-ring size  2, finish cable feedthrough  3, finalize window connection 4, IR-Thermashield strips for bridge sides 5, replace bridge support post with solid one

 

ELOG V3.1.3-