40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Mar 15 16:46:52 2013, Jenne, Bureaucracy, Auxiliary locking, Yend table upgrade - fast track? 
    Reply  Mon Mar 18 12:23:25 2013, Jenne, Bureaucracy, Auxiliary locking, Yend table upgrade - go fetch NPRO from ATF 
       Reply  Mon Mar 18 12:35:29 2013, Annalisa, Bureaucracy, Auxiliary locking, Yend table upgrade - go fetch NPRO from ATF 
          Reply  Mon Mar 18 13:10:19 2013, Koji, Bureaucracy, Auxiliary locking, Yend table upgrade - go fetch NPRO from ATF 
             Reply  Mon Mar 18 20:13:18 2013, Annalisa, Bureaucracy, Auxiliary locking, Yend table upgrade - go fetch NPRO from ATF 
             Reply  Wed Mar 20 16:45:59 2013, Manasa, Bureaucracy, Auxiliary locking, Fetched NPRO from ATF P3203298.JPGP3203299.JPG
Message ID: 8302     Entry time: Fri Mar 15 16:46:52 2013     Reply to this: 8304
Author: Jenne 
Type: Bureaucracy 
Category: Auxiliary locking 
Subject: Yend table upgrade - fast track? 

In light of the Yend auxiliary laser's ill health, I think we should reconsider the possibility of changing out the Yend laser table next week.

My thinking here is that if whatever the new mode matching solution is for a replacement laser (Tara has borrowed our spare NPRO that used to sit on top of the fridge, or we could take Annalisa's) requires a rework of the table layout, we might as well put the new layout onto the new table.  So, we need to figure out what laser we will put in as the new Ygreen, and what it's waist looks like.  If it just requires a small movement of existing lenses or new lenses in similar positions to the current ones, we can keep living with our current table.  But, if the mode matching solution requires enough changes to distances / lens placement / whatever, we should think seriously about putting in the new table next week.

Here's what I would like to see happen on / before Monday:

Annalisa - Mode matching solution for new laser.  If we get the laser back from Tara, this will involve first measuring the waist, otherwise we already know the waist of the ABSL laser that Annalisa is currently using.

Annalisa and Steve - Find optics for new mode matching in the lab, or order them by Monday afternoon.

Manasa - List of every screw, washer, optic, mount, etc. that will go on the new Y end table, with a notation as to whether or not we have it in-hand, and if not, what needs to happen before we do.  Also, for things that we don't have, I'd like to see a summary of temporary solutions (e.g. keep using current mount for doubling crystal while new one is being machined).

Manasa / Annalisa / Koji - will the new mode matching solution fit within the existing layout, or do we need to redo the table layout?

ELOG V3.1.3-