40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Feb 25 15:30:29 2013, yuta, Update, Alignment, Y arm locked, both colors 
    Reply  Mon Feb 25 17:58:28 2013, rana, Update, Alignment, Y arm locked, both colors 
       Reply  Mon Feb 25 22:42:32 2013, yuta, Summary, Alignment, current IFO situation IPANGdrift.png
    Reply  Mon Feb 25 21:25:14 2013, yuta, Update, Alignment, both arms locked in IR QUAD1_1045890588.png
       Reply  Tue Feb 26 01:49:27 2013, Jenne, Update, Locking, PRMI locked 
          Reply  Tue Feb 26 02:04:51 2013, Koji, Update, Locking, PRMI locked 
             Reply  Tue Feb 26 11:55:11 2013, Manasa, Update, Locking, FPMI locked 
                Reply  Tue Feb 26 15:32:47 2013, Jenne, Update, Locking, FPMI locked 
             Reply  Wed Feb 27 01:09:53 2013, yuta, Update, Locking, PRMI sideband/carrier locked 6x
                Reply  Wed Feb 27 02:44:39 2013, Jenne, Update, Locking, DRFPMI flashes 
                   Reply  Wed Feb 27 20:10:43 2013, rana, Update, Locking, DRFPMI flashes 
Message ID: 8158     Entry time: Mon Feb 25 17:58:28 2013     In reply to: 8157     Reply to this: 8164
Author: rana 
Type: Update 
Category: Alignment 
Subject: Y arm locked, both colors 

 

 That's good news. I was ready to give up and say we should vent and remove the baffles. It will be interesting if you can find out how much the sensors and OL and IPANG are off from their pre-pump values. We should think about how to have better references.

Also, what is the story with the large drift we are seeing in IPANG?

ELOG V3.1.3-