Message ID: 8133     Entry time: Thu Feb 21 19:55:02 2013
Author: Manasa 
Type: Update 
Category: Locking 
Subject: Green locking in arms 

[Yuta, Manasa]

We have aligned the Y-arm to lock in green. The green beams at the PSL table were clipping at the attenuation optics we installed for the vent (HWP-PBS-HWP). We had to move the polarization changing wave plate to get the green beam on the steering mirror. We installed the GRNT camera on the PSL table and aligned the arms to get TEM00 flashing. Green TRX PD was then installed and the trans power was brought to a maximum of 210uW.
We will use this to align the IR to the arm when we are back in full power tomorrow.

Attachment 1: ETMYF_1045540570.png  391 kB  | Hide | Hide all