40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 8132     Entry time: Thu Feb 21 18:10:13 2013
Author: rana 
Type: Update 
Category: SEI 
Subject: Pump Down misalignments 

This plot shows the trend of the OL during the past several hours of roughing pumping.

The big steps at the start of the pump down is NOT due to the pumping, but is instead the "recentering" that Yuta did. Looks like he was unable to find zero on the ETMY.

Some of the rest of the drift is probably just the usual diurnal variation, but there does seem to be some relation to the pumping trend. I guess that the shift of ~0.3 in the ITMX and ITMY pitch is real and pressure related.

We need to figure out how to put the OL calibration factor into the SUS-OL screens.

 

Attachment 1: OL.png  22 kB  | Hide | Hide all
OL.png
ELOG V3.1.3-