40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Feb 15 09:58:49 2013, Steve, Update, General, beam traps ready to be installed IMG_0083.JPGIMG_0084.JPG
    Reply  Fri Feb 15 16:09:19 2013, Koji, Update, General, beam traps ready to be installed HexBeamDump.pdfDiamondBeamDump2in.pdf
Message ID: 8089     Entry time: Fri Feb 15 16:09:19 2013     In reply to: 8087
Author: Koji 
Type: Update 
Category: General 
Subject: beam traps ready to be installed 

For the hexagonal one, insert one of the glass plate only half. Use a 1"x.5" piece if exists.

For the diamond one, you don't need the forth glass piece.

 

Attachment 1: HexBeamDump.pdf  193 kB  | Hide | Hide all
HexBeamDump.pdf
Attachment 2: DiamondBeamDump2in.pdf  169 kB  | Hide | Hide all
DiamondBeamDump2in.pdf
ELOG V3.1.3-