Entry  Fri Jul 25 10:48:13 2008, Koji, Update, General, Abs. Len. Meas. ~ Realignment / beating / PLL trial 
    Reply  Mon Jul 28 15:54:04 2008, Koji, Update, General, Abs. Len. Meas. ~ More on the beat / the PLL setup PLL_setup.pngbeat_at_8MHz.jpg
       Reply  Thu Jul 31 11:19:30 2008, Koji, Update, General, Abs. Len. Meas. ~ Resonance search trial 
          Reply  Sat Aug 2 12:53:43 2008, Koji, Update, General, Abs. Len. Meas. ~ New PLL at the PSL table yarm_dc.png
             Reply  Mon Aug 4 00:37:58 2008, Koji, Update, General, Abs. Len. Meas. ~ RF PD at the Y end / Manual frequency scan YEND_LAYOUT.png4th_FSR1.png4th_FSR2.png
                Reply  Mon Aug 4 05:23:57 2008, Koji, Update, General, Abs. Len. Meas. ~ Measurement for Y-arm completed 
                Reply  Mon Aug 4 21:48:24 2008, Koji, Update, General, Abs. Len. Meas. ~ Scan for TEM00/01/10 TEM00.pngTEM01.pngknife_edge.png
                   Reply  Mon Aug 4 22:31:10 2008, Koji, Update, General, Abs. Len. Meas. ~ Simple Test for TEM01/10 split TEM01_10.png
                   Reply  Tue Aug 5 00:05:57 2008, Koji, Update, General, Abs. Len. Meas. ~ IFR2023A calibration 
                      Reply  Wed Aug 6 11:10:34 2008, Koji, Update, General, Abs. Len. Meas. ~ analysis of the TEM00 scan TEM00fit.pngTEM00FSRfit.png
                         Reply  Wed Aug 6 11:43:52 2008, Koji, Update, General, Abs. Len. Meas. ~ analysis of the TEM01 scan TEM01fit.png
                            Reply  Thu Aug 14 21:52:51 2008, Koji, Summary, General, Abs. Len. Meas. ~ summary of my Summer mode_spacing_measurement_080816_v2.pdf
Message ID: 789     Entry time: Mon Aug 4 05:23:57 2008     In reply to: 787
Author: Koji 
Type: Update 
Category: General 
Subject: Abs. Len. Meas. ~ Measurement for Y-arm completed 
Finally, I have completed the abs length and g-factor measurements for Y-arm.
>>>GO FOR THE VENT<<<

I will report the results later.

Some notes on the status:
o Y-arm was aligned at the end of the experiment by the script. The values were saved.

o At the AP table, the injection beam and the flipper were left aligned so that the inj. beam can be used as a reference of the SRM and the ITMs. But the shutter of the NPRO was closed.

o The experiment setup was mostly left at the side of the AP table. I tried not to disturb the walk as much as possible.

o The long cable from the Y-end was wound and placed at the Y-end. The knife-edge was left on the Y-end bench. It is not disturbing any beam.