40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 7815     Entry time: Wed Dec 12 14:59:49 2012
Author: Manasa 
Type: Configuration 
Category: 40m Upgrading 
Subject: New tip-tilts layout in BSC 

I have updated the BSC layout to include the new tip-tilts. The bigger footprints of the tiptilts are on in the way of the existing PRM oplev path. So I have recalculated new PRM oplev paths. The proposed layout requires a new oplev mirror to be included.

 

bs.png

ELOG V3.1.3-