40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Dec 4 18:06:35 2012, Den, Update, SUS, TTs are ready IMG_0105.JPGIMG_0108.JPG
    Reply  Tue Dec 4 20:13:55 2012, Koji, Update, SUS, TTs are ready 
       Reply  Tue Dec 4 21:57:04 2012, Den, Update, SUS, TTs are ready 
Message ID: 7787     Entry time: Tue Dec 4 21:57:04 2012     In reply to: 7785
Author: Den 
Type: Update 
Category: SUS 
Subject: TTs are ready 

Quote:

Please leave here what was the instruction by Bran and Suresh so that the other people can redo it sometime later!

 The connectors can be plugged into the BOSEMs if we loosen the two screws which hold down the mini-D connector and the flex circuit.  Tighten the screws after the connector is pluged in.

ELOG V3.1.3-