40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Oct 18 03:57:20 2012, Jenne, Update, Locking, Alignment is really bad?? 
    Reply  Fri Oct 19 16:24:39 2012, rana, Update, Locking, Alignment is really bad?? 
       Reply  Fri Oct 19 16:45:39 2012, Steve, Update, VAC, vent has started 
          Reply  Fri Oct 19 19:26:42 2012, Jenne, Update, VAC, vent has started 
             Reply  Mon Oct 22 09:10:07 2012, Steve, Update, VAC, @750Torr ventOct222012.png
                Reply  Tue Oct 23 08:45:00 2012, Steve, Update, VAC, vent day 3 ventd4.pngIMG_1743.JPG
Message ID: 7594     Entry time: Tue Oct 23 08:45:00 2012     In reply to: 7587
Author: Steve 
Type: Update 
Category: VAC 
Subject: vent day 3 

Quote:

Quote:

Quote:

Quote:

 

 PSL shutter closed, manual block in place, HV turned off. P1 is at 200 Torr now.  Jenne is taking over here.

 Valves closed, 500 torr.  Steve will finish off Monday morning, then we'll take off doors and get to work.

 We are almost at atm.  P1 750 Torr,  We are slowly reaching equilibrium.

 The access connector was removed, BS and ITMY chambers were opened yesterday.

New one piece aluminum shell access connector installed. Jenne lowered the PSL out put into MC to ~100mW

Attachment 1: ventd4.png  37 kB  | Hide | Hide all
ventd4.png
Attachment 2: IMG_1743.JPG  1.994 MB  Uploaded Tue Oct 23 10:02:13 2012  | Hide | Hide all
IMG_1743.JPG
ELOG V3.1.3-