All the front end machines are back up after the outage. It looks like none of the front end machines came back up once power was restored, and they all needed to be powered manually. One of the things I want to do in the next CDS upgrade is put all the front end computers in one rack, so we can control their power remotely.
c1sus was the only one that had a little trouble. It's timing was for some reason not syncing with the frame builder. Unclear why, but after restarting the models a couple of times things came back.
There's still a little red, but it mostly has to do with the fact that c1oaf is busted and not running (it actually crashes the machine when I tried to start it, so this needs to be fixed!).
|