Entry  Mon Sep 24 16:59:31 2012, Jenne, Update, VAC, Doors on, ready to pump 
    Reply  Mon Sep 24 17:47:05 2012, Steve, Update, VAC, ready to pump 
       Reply  Tue Sep 25 17:21:01 2012, Steve, Update, VAC, pumpdown completed pd73.pngpd73b.png
          Reply  Wed Sep 26 11:03:04 2012, Steve, Update, VAC, pumpdown completed 40mpd73md1.png28datm.png
             Reply  Mon Oct 1 09:02:17 2012, Steve, Update, VAC, pumpdown reached vacuum normal pd73md6.pngpd73md6b.png
                Reply  Tue Oct 2 09:13:16 2012, Steve, Update, VAC, RGA scan at day 7 pd73md7.png
                Reply  Tue Oct 9 09:29:10 2012, Steve, Update, IOO, this is where we are 15days.png
    Reply  Mon Oct 8 22:07:46 2012, rana, Update, SUS, Doors on, ready to pump 20120921_200637.jpg
Message ID: 7438     Entry time: Tue Sep 25 17:21:01 2012     In reply to: 7434     Reply to this: 7441
Author: Steve 
Type: Update 
Category: VAC 
Subject: pumpdown completed 

 IFO P1= 1mTorr,   CC1 = 5e-4 Torr.  The IFO is ready for work. Be free to open the shutter and turn on HV

Jenne will double check the MC -REFL path for 1W power.  There is a manual block on the PSL table.

Atm1,  Pirani gauge at 9 h 10 min

Atm2, Pump configuration of pd#73 at 9h 35 min

 