40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Sep 21 20:48:24 2012, Jenne, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
    Reply  Fri Sep 21 22:25:44 2012, Mike J., Update, General, POX, POY, PR2 pics 10x
    Reply  Mon Sep 24 23:45:39 2012, rana, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
       Reply  Tue Sep 25 14:29:07 2012, Jenne, Update, General, POP in-vac optics aligned, POY beam coming out of vac 
Message ID: 7436     Entry time: Mon Sep 24 23:45:39 2012     In reply to: 7426     Reply to this: 7437
Author: rana 
Type: Update 
Category: General 
Subject: POP in-vac optics aligned, POY beam coming out of vac 

  What was the reasoning / resolution of the POP forward/backward beam? Are we going to have the right beam for DRMI locking?

ELOG V3.1.3-