40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Sep 17 20:23:31 2012, Jenne, Update, General, Last of In-vac mirror photos taken 
    Reply  Mon Sep 17 23:58:01 2012, rana, Update, General, Last of In-vac mirror photos taken 
       Reply  Thu Sep 20 14:55:06 2012, Jenne, Update, General, Pickoffs are hard to see 
          Reply  Thu Sep 20 19:56:05 2012, Jenne, Update, General, Pickoffs are hard to see 
    Reply  Tue Sep 18 11:53:12 2012, Jenne, Update, General, Last of In-vac mirror photos taken AllPhotos_Sept2012.pdf
       Reply  Wed Sep 19 01:15:15 2012, Jenne, Update, General, Last of In-vac mirror photos taken - NOT! 
Message ID: 7400     Entry time: Mon Sep 17 23:58:01 2012     In reply to: 7399     Reply to this: 7420
Author: rana 
Type: Update 
Category: General 
Subject: Last of In-vac mirror photos taken 

 My hope is that the DRMI flashes will be bright enough to see on the PO beams. IF we get 10 mW through the Faraday, you should get some buildup when the carrier resonates in the DRMI.

If the recycling gain is 10 and the pickoff fraction is 100 ppm you ought to get ~10 uW on PO. How much of the recycling cavity power gets out of POP?

ELOG V3.1.3-