40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 7291     Entry time: Tue Aug 28 00:16:19 2012
Author: jamie 
Type: Update 
Category: General 
Subject: Alignment and vent prep 

I think we (Jenne, Jamie) are going to leave things for the night to give ourselves more time to prep for the vent tomorrow.

We still need to put in the PSL output beam attenuator, and then redo the MC alignment.

The AS spot is also indicating that we're clipping somewhere (see below).  We need to align things in the vertex and then check the centerings on the AP table.

So I think we're back on track and should be ready to vent by the end of the day tomorrow.

Attachment 1: as1.png  99 kB  | Hide | Hide all
as1.png
ELOG V3.1.3-