40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 7192     Entry time: Wed Aug 15 13:23:34 2012
Author: Liz 
Type: Summary 
Category: Computer Scripts / Programs 
Subject: Last Weekly Update 

Over the past week I have been continuing to finalize the daily summary pages, attempting to keep the total run time under half an hour so that they can be run frequently.  I have had many hang ups with the spectrograms and am currently using second trends (with this method, the entire script takes 15 minutes to run).  I also have a backup method that takes 3 minutes of data for every 12 minutes, but could not implement any interpolation correctly.  This might be a future focus, or the summary pages could be configured to run in parallel and full data for the spectrograms can be used.  I configured Steve's tab to include one page of images and one page of plots and fixed the scripts so that it corrects for daylight savings time (at the beginning of the running, the program prints 'DST' or 'Not DST').

Right now, I am focusing on making coherence plots in a spectrogram style (similar to the matlab 'coh_carpet' function) and a spectrogram depicting Gaussianity (similar to the plots made by the RayleighMonitor).  I have also been working on my  final paper and presentation.

ELOG V3.1.3-