40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Jul 27 14:28:36 2012, steve, Update, VAC, cold cathode gauges cc_gauges.png
    Reply  Mon Jul 30 15:49:16 2012, steve, Update, VAC, cc1 switched cc1changedfVtH.png
       Reply  Tue Jul 31 08:01:22 2012, steve, Update, VAC, cc1 switched cc1h1d.png
          Reply  Mon Aug 6 10:53:32 2012, steve, Update, VAC, status: vauum normal CCgauges.png
Message ID: 7089     Entry time: Mon Aug 6 10:53:32 2012     In reply to: 7056
Author: steve 
Type: Update 
Category: VAC 
Subject: status: vauum normal 

 

 The power outage did not have any effect on the vacuum system.  I had to open VM1 to the RGA because of flaky CC1 cold cathode gauge fluctuations.

We are running on the vertically positioned CC1 again.

Note: rga scans with closed VM1 are back ground scans.

Attachment 1: CCgauges.png  65 kB  | Hide | Hide all
CCgauges.png
ELOG V3.1.3-