40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Jul 26 13:10:51 2012, janosch, Update, LSC, modelled ringdown Ringdown.png
    Reply  Thu Jul 26 15:43:03 2012, rana, Update, LSC, modelled ringdown 
Message ID: 7038     Entry time: Thu Jul 26 13:10:51 2012     Reply to this: 7039
Author: janosch 
Type: Update 
Category: LSC 
Subject: modelled ringdown 

We fitted shutter and ringdown functions to the ringdown data. It is not perfectly clear how the power change due to the shutter is handed over to the power change due to ringdown. The fit suggests that the ringdown starts at a later time, but this does not necessarily make sense. It could be that the slow power decrease when the shutter starts clipping the TEM00 beam is followed by the cavity, but then the power decrease becomes too fast when the shutter reaches the optical axis and the ringdown takes over. Also, the next measurement should be taken with adjusted DC offset.

Ringdown.png

ELOG V3.1.3-