Message ID: 7016     Entry time: Tue Jul 24 02:12:14 2012
Author: Masha 
Type: Update 
Category: PEM 
Subject: BLRMS, MEDM, Triangulation 

Today I worked with the BLRMS channels, re-triangulated the seismometers (the STS is now on the very end of the Y-arm, while the GUR2 is on the X-arm - this GUR2 cable will need to be either extended or replaced - Jenne and I will look at parts tomorrow), and added 0.01 - 0.03 Hz and 0.03 - 0.1 Hz RMS channels (However, the MEDM files for these are not yet complete - I will finish these tomorrow) in order to be able to better see earthquakes. I also did some things for the neural network project, including beginning Simulink tutorials so that I can run my code by applying a force on a damped harmonic oscillator + white noise until it stops.

I will explain the methodology behind the new RMS filters tomorrow morning, when the seismometers have settled down and I can make coherence plots.

I'll post a better E-log tomorrow when it's not 2 in the morning.