40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 6974     Entry time: Fri Jul 13 15:49:38 2012
Author: yuta 
Type: Bureaucracy 
Category: General 
Subject: 40m Priority Action Items 

These are all priority action items need to be done before I come back (in mid-September).
BE PREPARED FOR THE FULL LOCK!

NEXT VENT:
        - Prepare and install tip-tilts -JAMIE
        - Adjust IP-ANG -JAMIE, JENNE, KOJI
        - Make sure there's no clipping. Start from MC centering -JAMIE, JENNE, KOJI

ASS/A2L:
        - Make ASS and A2L work -JENNE, JAMIE
        - Better MC spot position measurement script(see the last sentence in elog #6892) -JENNE
        - Daily beam spot measurements for IFO, just like MC -JENNE
        - ASS for green using PZT steering mirrors on end table -JENNE
        - Modeling of phase tracking ALS -JAMIE

ALS:
        - PZT mounts for PSL and ALS beams -JENNE, KOJI
        - Add temperature sensors for end lasers to CDS slow channels -JENNE
        - Put green trans camera, GTRY PD, and GTRX PD on PSL table -JENNE
        - Better beat box; include comparators, frequency dividers, and whitening filters -JAMIE, KOJI
        - Adjust servo gain/filters of end green PDH lock (reduce frequency noise) -JENNE
        - Add on/off switch, gain adjuster, etc to CDS for end green PDH lock -JENNE, JAMIE

PRC:
        - Find why and reduce 3 Hz motion -JENNE
        - Simulation of PRMI with clipping -YUTA
        - Alignment tolerance of PRMI -YUTA

ELOG V3.1.3-