40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Jul 2 18:27:25 2012, yuta, Update, General, BS and ITMX chambers closed 
    Reply  Tue Jul 3 17:23:50 2012, steve, Update, VAC, pumpdown completed pd72.pngpd72vacnormal.pngpd72at9hrs.png
       Reply  Fri Jul 6 09:27:40 2012, steve, Update, VAC, 4 days at atm vent_moves.png
          Reply  Fri Jul 6 09:52:35 2012, steve, Update, VAC, pump down hick up d3wFireworks.pngpdhickup.png
Message ID: 6930     Entry time: Fri Jul 6 09:52:35 2012     In reply to: 6929
Author: steve 
Type: Update 
Category: VAC 
Subject: pump down hick up 

 I can not understand what really happened here with CC1 gauge or there was really a pressure glitch.

 

attachment 1,  pump down day 3 with 4th of July fireworks in the lab

attachment 2,  before and after vent in 9 days

 

 

Attachment 1: d3wFireworks.png  40 kB  Uploaded Fri Jul 6 11:04:14 2012  | Show | Hide all | Show all
Attachment 2: pdhickup.png  37 kB  Uploaded Fri Jul 6 11:13:51 2012  | Hide | Hide all | Show all
pdhickup.png
ELOG V3.1.3-