40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Jun 22 02:21:57 2012, Jenne, Update, Green Locking, 2 arm ALS - Success!!!! P6210140.AVIspeedy_gonzales-5257.jpg
    Reply  Fri Jun 22 03:37:42 2012, Koji, Update, Green Locking, 2 arm ALS - Success!!!! 
       Reply  Fri Jun 22 10:52:18 2012, yuta, Update, Green Locking, 2 arm ALS - Success!!!! 
Message ID: 6853     Entry time: Fri Jun 22 10:52:18 2012     In reply to: 6852
Author: yuta 
Type: Update 
Category: Green Locking 
Subject: 2 arm ALS - Success!!!! 

Answers to questions from Koji.

Are these correct?

1. It is a nice work.

Correct, of course!

2. This is not locking, but stabilization of the both arms by ALS.

Correct.

3. We now have the phase trackers for both arms.

Correct.

4. There is no coarse (i.e. short) delay line any more.

Correct. No coarse, only fine delay line (30m) with the phase tracker.

5. The splitters after the PDs are reducing the RF power to Beat-box.
Actually there are RF monitors on Beat-box for this purpose, but you did not notice them.

Oh, yes. But distance between beatbox and spectrum analyzer in the control room is longer than distance between BBPD on PSL table and the spectrum analyzer. We were too lazy to do cabling, but maybe we should.

6. c1ioo channel list 
https://wiki-40m.ligo.caltech.edu/CDS/C1IOO%20channel%20list
has to be updated.

Yes, we will.

7. Video can be uploaded to Youtube as Mike did at http://nodus.ligo.caltech.edu:8080/40m/6513

We didn't, but we can.

ELOG V3.1.3-