40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 6850     Entry time: Thu Jun 21 20:07:18 2012
Author: Jamie 
Type: Update 
Category: Green Locking 
Subject: Improved beatbox returns 

I've reinstalled the beatbox in the 1X2 rack.  This improved version has the X and Y arm channels stuffed, but just one of the DFD channels (fine) each.

I hooked up the beat PD signals for X and Y to the RF inputs, and used the following two delay lines:

  • X: 140' light-colored cable on spool
  • Y: 30m black cable

The following channel --> c1ioo ADC --> c1gcv model connections were made:

  • X I  --> SR560 whitening --> ADC 22 -->  X fine I
  • X Q --> SR560 whitening --> ADC 23 --> X fine Q
  • Y I --> SR560 whitening --> ADC 24 --> Y fine I
  • Y Q --> SR560 whitening --> ADC 25 --> Y fine Q

The connections to the course inputs on the ALS block were grounded.  I then recompiled, reinstalled, and restarted c1gcv.  Functioning fine so far.

 

ELOG V3.1.3-