40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Sep 14 15:05:52 2011, steve, Update, PEM, air cond maintenance  ac1y.jpg
    Reply  Tue Jun 5 14:17:14 2012, steve, Update, PEM, air cond maintenance  
       Reply  Thu Jun 7 09:52:05 2012, steve, Update, PEM, air cond maintenance  PEM800d.png
Message ID: 6782     Entry time: Thu Jun 7 09:52:05 2012     In reply to: 6754
Author: steve 
Type: Update 
Category: PEM 
Subject: air cond maintenance  

Quote:

 

 Air conditioning maintenance is scheduled for tomorrow from 8 to 11am

 Jeff checked and  replaced filters  as needed. Job completed this morning.

Attachment 1: PEM800d.png  51 kB  | Hide | Hide all
PEM800d.png
ELOG V3.1.3-