8 hr plot,
precondition: 5 days at atm,
vent objective: drag wiping mc1, mc2 & mc3 accomplished,
hardware changes: IOO access connector, mc2 chamber door south & west
were removed and reinstalled
pump down mode: slow to avoid steering up dust
One roughing pump was used with closed down valve position in the first 4 hrs
Andrey was very helpful |