40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Mar 26 23:47:54 2012, Suresh, Update, IOO, Beam Profile measurement: IPPOS beam BeamProfile_IPPOS.pngBeamProfile_IPPOS.pdfBeamProfileData_IPPOS.xlsx
    Reply  Tue Mar 27 02:05:40 2012, Suresh, Update, IOO, Beam Profile measurement: IPPOS beam BeamProfile_IPPOS.pngBeamProfile_IPPOS.png
       Reply  Tue Mar 27 11:54:18 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam IPPOS_distances.pdf
          Reply  Tue Mar 27 18:03:46 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam BeamProp_usingMeas2012MMTnumbersLowRes.png
             Reply  Tue Mar 27 21:20:32 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam BeamProp_usingMeas2012MMTnumbersLowRes.png
                Reply  Tue Mar 27 23:37:35 2012, Suresh, Update, IOO, Beam Profile measurement: IPPOS beam Beam-Profile_IPPOS_wError.png
                Reply  Wed Mar 28 01:17:29 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam BetterDistances_IPPOSLowRes.pngBetterDistances_MainIFO_PRMnormalLowRes.pngBetterDistances_MainIFO_PRMflippedLowRes.png
                   Reply  Wed Mar 28 18:26:47 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam OptimizedMMT_halfMeterChange_IPPOSviewLowRes.pngOptimizedMMT_halfMeterChange_IFOviewLowRes.pngOptimizedMMT_pt2cMeterChange_IPPOSviewLowRes.pngOptimizedMMT_pt2cMeterChange_IFOviewLowRes.png
                      Reply  Wed Mar 28 20:54:02 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam MMT_moved_by_1pt3meters_MMT1th_25_MMT2th_12_LowRes.pngMMT_moved_by_1pt3meters_MMT1th_25_MMT2th_12_LowRes.png
                         Reply  Mon Apr 2 18:58:32 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam NonOptimized_propagatedWaistPlotted_LowRes.png
                         Reply  Mon Apr 2 23:06:38 2012, Suresh, Update, IOO, Beam Profile measurement: IPPOS beam: Mystery deepens 40mOpticsLocations.pdfBeam-Profile_IPPOS_wError.pdfBeam-Profile_PRM_1_wError.pdf
       Reply  Tue Mar 27 17:19:02 2012, Koji, Update, IOO, Beam Profile measurement: IPPOS beam 
    Reply  Tue Mar 27 02:18:31 2012, keiko, Update, IOO, Beam Profile measurement: IPPOS beam text9149.pngfirst_cap.pngsecond_cap.pngtext9149.png
       Reply  Tue Mar 27 16:06:59 2012, keiko, Update, IOO, Beam Profile measurement: IPPOS beam 
Message ID: 6462     Entry time: Wed Mar 28 20:54:02 2012     In reply to: 6461     Reply to this: 6476   6477
Author: Jenne 
Type: Update 
Category: IOO 
Subject: Beam Profile measurement: IPPOS beam 

I fitzed by hand with the numbers for the incident angles on MMT1 and MMT2, and then let the code optimize the position of MMT1 and MMT2.

Here I have set the incident angle for MMT1 = 25deg, and MMT2 = 12deg (should be 3.5deg, 1deg by design).  The length of the telescope doesn't want to change by more than 7mm, but the position of the telescope wants to change by 1.3meters.  Is it possible that the distances on the Monday IPPOS measurements aren't actually correct?

MMT_moved_by_1pt3meters_MMT1th_25_MMT2th_12_LowRes.png

Attachment 1: MMT_moved_by_1pt3meters_MMT1th_25_MMT2th_12_LowRes.png  434 kB  | Hide | Hide all
MMT_moved_by_1pt3meters_MMT1th_25_MMT2th_12_LowRes.png
ELOG V3.1.3-