Wed Mar 21 10:31:28 2012, steve, Update, SAFETY, AC power to ETMY turned off
|
Wed Mar 21 11:32:47 2012, steve, Update, SAFETY, AC power to ETMX turned off
|
Wed Mar 21 19:12:27 2012, steve, Update, Computers, AC power back on both ends
|
Thu Mar 22 16:45:06 2012, kiwamu, Update, CDS, c1scx and c1scy not properly running
|
Thu Mar 22 17:41:15 2012, suresh, Update, CDS, c1scx and c1scy not properly running
|
Thu Mar 22 23:43:56 2012, Koji, Update, CDS, c1scx and c1scy not properly running
|
|
Message ID: 6434
Entry time: Wed Mar 21 19:12:27 2012
In reply to: 6433
Reply to this: 6436
|
Author: |
steve |
Type: |
Update |
Category: |
Computers |
Subject: |
AC power back on both ends |
|
|
Quote: |
Quote: |
ETMY sus damping was disabled. Green locking laser and associated electronics turned off. Computers and power supplies turned off at rack 1Y4
The electricians picking up ac power from 1Y4 manual disconnect box and installing conduit line to ISCT-ETMY east end optical table.
There will be no more daisy chaining this way.
|
The power is back on at ETMY . c1iscey has not been restarted.
Now I'm turning ac power off at ETMX for the same job to be done.
|
The power was turned back on at 4pm It took some time for Suresh to restart the computers. We have damping but things are not perfect yet. Auto BURTH did not work well. |