40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Feb 21 16:10:29 2012, kiwamu, Update, IOO, degradation in input PZT1 
    Reply  Mon Mar 5 03:50:49 2012, kiwamu, Update, IOO, PZT1 PITCH railing 
       Reply  Mon Mar 5 17:07:58 2012, kiwamu, Update, IOO, realigned MC 
          Reply  Thu Mar 8 23:37:03 2012, kiwamu, Update, IOO, dither Y arm dither script 
          Reply  Wed Mar 14 04:03:37 2012, kiwamu, Update, IOO, PZT1 and associate extra works 
Message ID: 6351     Entry time: Mon Mar 5 03:50:49 2012     In reply to: 6300     Reply to this: 6357
Author: kiwamu 
Type: Update 
Category: IOO 
Subject: PZT1 PITCH railing 

PZT1 started railing in the pitch direction and because of this TRY doesn't go more than 0.7. I will leave it as it is for tonight.

Tomorrow I will shift the alignment of the MC to make the PZT1 happier.

Quote from #6300

PZT1, the one with Koji's custom mid-HV driver (#5447), is getting degraded.

 

ELOG V3.1.3-