Two new BBPDs have been installed on the PSL table.
The first one was installed by Koji a few days ago, and I stalled the second one today.
They will serve as beat-note detectors for the green locking.
Next step : I have to lay down a long SMA cable which goes from the BBPD to the IOO rack. |