40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Jan 19 23:34:52 2012, kiwamu, Update, IOO, PMC realignment and HEPA 
    Reply  Mon Jan 23 15:43:47 2012, Jenne, Update, IOO, PMC realignment 
       Reply  Mon Jan 23 23:12:00 2012, kiwamu, Update, IOO, PMC realignment 
          Reply  Mon Jan 30 08:17:06 2012, steve, Update, IOO, PMC  sickPMC.png
             Reply  Tue Jan 31 08:44:10 2012, steve, Update, IOO, laser shuts down laseroff.png
                Reply  Tue Jan 31 14:58:30 2012, kiwamu, Update, IOO, laser shuts down 
                   Reply  Tue Jan 31 17:13:49 2012, steve, Update, IOO, only the PSL laser is off 
                      Reply  Wed Feb 1 17:00:57 2012, steve, Update, IOO, laser is back ON P1080525.JPGP1080514.JPGP1080518.JPG
                         Reply  Fri Feb 3 14:47:51 2012, steve, Update, PEM, laser interlock drawing 
Message ID: 6245     Entry time: Fri Feb 3 14:47:51 2012     In reply to: 6242
Author: steve 
Type: Update 
Category: PEM 
Subject: laser interlock drawing 

 Rough draft of      updated interlock drawing by Ben is here.

 

ELOG V3.1.3-