40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Nov 14 17:01:14 2011, kiwamu, Update, Green Locking, ALS feedback on MC2 
    Reply  Wed Dec 28 14:13:16 2011, kiwamu, Update, Green Locking, ALS feedback on MC2 MC2_ALS.png
Message ID: 6154     Entry time: Wed Dec 28 14:13:16 2011     In reply to: 5888
Author: kiwamu 
Type: Update 
Category: Green Locking 
Subject: ALS feedback on MC2 

I added an ALS feedback path on the MC2 suspension and this path will enable us to stabilise the MC length using the ALS scheme.

  The actual digital signal is transmitted from the c1gcv realtime controller to the c1mcs realtime controller through the c1rfm realtime process.
Or in terms of the machines, the signal is transmitted from C1IOO to C1SUS via the reflective memory network.
 
The attached figure is a screen shot of the MC2 position controller screen.  The new ALS path is emphasized by a purple circle in the figure.
MC2_ALS.png

Quote from #5888

Leaving a note on the ALS feedback before I forget:

The MC2 suspension needs to have an input for the ALS feedback in the realtime model like ETMs.

 

ELOG V3.1.3-