40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Dec 26 14:01:45 2011, kiwamu, Update, LSC, multiple-LOCKIN newly added multiple-lockin.png
    Reply  Tue Dec 27 22:17:56 2011, kiwamu, Update, LSC, multiple-LOCKIN new screens Untitled.png
Message ID: 6152     Entry time: Tue Dec 27 22:17:56 2011     In reply to: 6150
Author: kiwamu 
Type: Update 
Category: LSC 
Subject: multiple-LOCKIN new screens 

Some new screens have been made for the new multiple-LOCKIN system running on the LSC realtime controller.

The medm screens are not so pretty because I didn't spend so long time for it, but it is fine for doing some actual measurements with those new screens.

So the basic works for installing the multiple-LOCKIN are done.

 

 The attached figure is a screen shot of the LOCKIN overview window.

As usual most of the components shown in the screen are clickable and one can go to deeper levels by clicking them. 

Untitled.png

Quote from #6150
The multiple LOCKIN module has been newly added on the LSC realtime model.
I will make some MEDM screens for this multiple-LOCKIN system.

ELOG V3.1.3-