As planed (#6143), rearrangement of the PSL green setup has begun.
It required to move approximately half of the green optics on the PSL table
and I finished displacing and installing the necessary optics coarsely.
So far I just have recovered the Y arm beat-note between the PSL green light.
I will do a fine alignment of the X arm path on the PSL table and try obtaining the X arm beat-note tonight. |