40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Sat Dec 17 01:56:16 2011, Koji, Summary, SUS, Hysteresis test 
    Reply  Sat Dec 17 03:59:32 2011, kiwamu, Update, SUS, Aborted Hysteresis test 
       Reply  Sat Dec 17 11:53:46 2011, Zach, Update, SUS, Aborted Hysteresis test 
          Reply  Sat Dec 17 12:41:46 2011, Koji, Update, SUS, Aborted Hysteresis test 
       Reply  Sun Dec 18 16:16:55 2011, kiwamu, Update, SUS, Another trial of Hysteresis test 
          Reply  Sun Dec 18 19:56:00 2011, kiwamu, Update, SUS, Another trial of Hysteresis test 
Message ID: 6134     Entry time: Sun Dec 18 19:56:00 2011     In reply to: 6132
Author: kiwamu 
Type: Update 
Category: SUS 
Subject: Another trial of Hysteresis test 

The measurement finished at ~ 21:50 PT.

Quote from #6132

A new test started from 16:05 PT, Dec 18th and takes a couple of hours to finish the measurement.

Do not touch the suspensions until further notice.

ELOG V3.1.3-