Entry  Wed Dec 14 01:35:06 2011, Koji, Update, IOO, MC alignment craziness Untitled.png
    Reply  Wed Dec 14 14:07:48 2011, Koji, Update, IOO, MC alignment craziness 
Message ID: 6118     Entry time: Wed Dec 14 14:07:48 2011     In reply to: 6115
Author: Koji 
Type: Update 
Category: IOO 
Subject: MC alignment craziness 

[Kiwamu Koji]

To check if the MC alignment is OK or not, we tried to lock the Y-arm.

Once the alignment of Y-arm was restored, we saw the resonant peak of ~0.2 in TRY.
After a small tweak of PZT2, TRY has got improved up to 0.7.

Kiwamu made a small tweak on the problematic PZT1, then the full (1.0) TRY was recovered.

Thus we concluded the current MC alignment is good enough.