40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Oct 28 18:33:59 2011, steve, Update, VAC, leaking nitrogen line fixed allvalvesclosed.png
    Reply  Mon Oct 31 08:55:19 2011, steve, Update, VAC, pressure plot at day 53 pd71-m-d53.png
Message ID: 5767     Entry time: Mon Oct 31 08:55:19 2011     In reply to: 5759
Author: steve 
Type: Update 
Category: VAC 
Subject: pressure plot at day 53 

Quote:

I was lucky to notice that the nitrogen supply line to the vacuum valves was leaking. Closed ALL valves. Open supply line to atm. Fixed leak. 

This was done fast so the pumps did not have to be shut down. Pressurized supply line and open valves to

"Vac Normal" condition in the right sequence.

 

Attachment 1: pd71-m-d53.png  37 kB  | Hide | Hide all
pd71-m-d53.png
ELOG V3.1.3-