40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Sep 30 18:35:42 2011, steve, kiwamu, Update, VAC, vacuum set for poweroutage prepforpoweroutage.png
    Reply  Fri Sep 30 19:12:56 2011, Koji, Update, General, prep for poweroutage 
Message ID: 5590     Entry time: Fri Sep 30 18:35:42 2011     Reply to this: 5591
Author: steve, kiwamu 
Type: Update 
Category: VAC 
Subject: vacuum set for poweroutage 

We did the following:

1, closed V1, VM1,  annuloses: VASE, VASV, VABS, VAEV,  VAEE and VA6

2, stop rotation of Maglev-TP1, waited to decellerate and turned off power to it

3, closed V4,  stoped rotation of TP2, waited to decellerate and turned power off

4, opened VM3 to RGA that is still running

 

I will come in tomorrow 9-10am to restart pumping.

Attachment 1: prepforpoweroutage.png  26 kB  | Hide | Hide all
prepforpoweroutage.png
ELOG V3.1.3-