40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Sep 20 23:59:53 2011, Koji, Summary, LSC, Plan to update the LSC code for multiple lock-ins 
    Reply  Wed Sep 21 14:28:25 2011, Koji, Summary, LSC, The LSC code/screen modification for LSC LOCKINs 
       Reply  Thu Sep 22 18:33:01 2011, Koji, Summary, LSC, The LSC screen modification PD_screen.png
          Reply  Thu Sep 22 23:18:51 2011, Koji, Summary, LSC, The LSC screen modification C1LSC_RFPD.png
Message ID: 5522     Entry time: Thu Sep 22 18:33:01 2011     In reply to: 5498     Reply to this: 5528
Author: Koji 
Type: Summary 
Category: LSC 
Subject: The LSC screen modification 

As per the request of Anamaria, I have added the slider of the demodulation phase for each RF PD screens.

Attachment 1: PD_screen.png  19 kB  | Hide | Hide all
PD_screen.png
ELOG V3.1.3-