Entry  Tue Sep 20 23:59:53 2011, Koji, Summary, LSC, Plan to update the LSC code for multiple lock-ins 
    Reply  Wed Sep 21 14:28:25 2011, Koji, Summary, LSC, The LSC code/screen modification for LSC LOCKINs 
       Reply  Thu Sep 22 18:33:01 2011, Koji, Summary, LSC, The LSC screen modification PD_screen.png
          Reply  Thu Sep 22 23:18:51 2011, Koji, Summary, LSC, The LSC screen modification C1LSC_RFPD.png
Message ID: 5498     Entry time: Wed Sep 21 14:28:25 2011     In reply to: 5492     Reply to this: 5522
Author: Koji 
Type: Summary 
Category: LSC 
Subject: The LSC code/screen modification for LSC LOCKINs 

The LSC code has been modified

- The code was modified, compiled, and installed.

- The code is now running. FB was restarted to deal with the change of the channel names.

- Now we have LOCKIN1, 2, and 3. This required the change of the names from C1:LSC-LOCKIN_.... to C1:LSC-LOCKIN1_...

 

- The LSC screen has also modified. It has three lockins on the screen.

- The corresponding matrix screens have been modified/created and linked from the main screen.

- I need to make the screens more cool but the locking team can start to use those lockins.